Environment – Full Detail Notes

Solid Waste Management, Environmental Assessment (BES, IEE, EIA), Rain Water Harvesting and Chure Conservation

PSC Subjective Note · Nepal Engineering Service (Civil), Second Paper · Lok Sewa Aayog

Solid Waste Management

Solid Waste Management

Recycle: Convert waste into useful product.

Solid Waste

Introduction:

Solid Waste Management

Introduction:


Types and Characteristics of Solid Waste

Types of Solid Waste

The solid waste in Nepal's municipalities is categorized by its source and its physical makeup:

Types by Source

The main sources of municipal solid waste (MSW) are:

Physical Characteristics (Composition)

On average, MSW in Nepal consists of:

Characteristics of Solid Waste

The characteristics of solid waste are given below:

Physical Characteristics

Chemical Characteristics

Biological Characteristics


Garbage Collection and Disposal

Garbage Collection

Disposal

Garbage Collection Methods


Method of Solid Waste Disposal

In the context of Nepal, several methods are used for final disposal which are given below:

Sanitary Landfill

Figure: photograph of a sanitary landfill site

Dumping

Figure: photograph of open dumping of waste

3R Method

There is a growing focus on the 3R principle (Reduce, Reuse, Recycle).

Figure: inverted-triangle diagram, from "Most preferred" at top to "Least" at bottom

Composting

Figure: photograph of composting piles

Incineration Method

Figure: diagram of an incinerator plant with combustion chamber, condenser, bag house and chimney
Environmental Assessment

Concept of Environmental Assessment

Established


BES (Brief Environmental Study)


IEE (Initial Environmental Examination)


EIA (Environmental Impact Assessment)


Explain Briefly About the Process of EIA (10)

Project Selection and Scoping

Initial Stage

If EIA is Required

Submission to Ministry

Scoping and TOR Approval

Review and Approval

Preparation of TOR

TOR Approval

EIA Report Preparation and Public Hearing

Public Hearing

Report Preparation

Language

Review and Recommendation

Submission of Report

Recommendation from Local Level

Review Committee

Time Period

Final Approval

Decision

Processing Time

Project Implementation

Environmental Protection Plan

EIA Process Flow Chart

Figure: flow chart of EIA process

Government Rules, Regulation and Procedures for BES, IEE and EIA

(The content under this heading in the book — Schedule-1, Rule 3 related lists of project types — is written entirely in Nepali and has therefore been omitted.)

Rain Water Harvesting

Rain Water Harvesting

Introduction

Rain water harvesting is the process of collecting, filtering and storing the rain water from surface, roof tops or open land for the purpose of

As per Act and Regulation 2019, 2020

Advantage of Rain Water Harvesting

Advantage of rain water harvesting are given below:

Disadvantage of Rain Water Harvesting

Disadvantage of rain water harvesting are given below:

Figure: diagram of a house with "Rain Water Harvesting" — collection area (roof) and storage tank
Chure Conservation Efforts in Nepal

Chure Conservation Efforts in Nepal

President Chure-Conservation Program

Main Objectives of the Master Plan

Implementation

Main Programs

Long / Descriptive Questions and Answers

Long / Descriptive Questions and Answers

Difference between IEE and EIA (5)

Basis IEE EIA
Full Form Initial Environmental Examination Environmental Impact Assessment
Meaning An analytical study and assessment carried out to ascertain whether the implementation of a proposal will cause significant adverse impacts on the environment, and to identify measures to avoid, mitigate or minimize such impact. A detailed study and evaluation carried out to determine whether the implementation of a proposal will cause significant adverse effect on the environment, and to identify measures to avoid, mitigate or minimize such effect.
Project Size Suitable for small scale projects Suitable for large scale projects (Melamchi Khanepani, Nagdhunga Tunnel)
Scoping Not required Required
Approval Authority Concerned authority (Province and Central Government) as per EPR 2077 Ministry of Forest and Environment (MOFE) through the concerned line ministry of Nepal Government
Format of TOR Schedule 7 Schedule 8
Report Format Schedule 11 Schedule 12
Public Notice Any local newspaper Any one National Daily Newspaper and its website (Gorkhapatra, Kantipur, Kathmandu Post)
Time and Budget Short time, less budget and less human resources More time, more budget and more human resources

Explain Different Types of Environmental Impacts with Examples (5) or (10)

Environmental Impacts

Environmental impacts are the changes that occur in the environment due to a project, plan, or human activity.

It is classified into several types:

Positive Environmental Impact

Positive environmental impacts are the beneficial effects on the environment.

Examples:

Negative Environmental Impact

Negative environmental impacts are the harmful effects on the environment.

Examples:

Direct Environmental Impact

Direct impacts are the immediate effects of a project or activity.

Examples:

Indirect Environmental Impact

Indirect impacts are the secondary effects that occur later.

Examples:

Short-term Environmental Impact

Short-term impacts last for a limited period of time.

Examples:

Long-term Environmental Impact

Long-term impacts last for a long period or permanently.

Examples:

Reversible Environmental Impact

Reversible impacts are those that can be corrected or restored.

Examples:

Irreversible Environmental Impact

Irreversible impacts are those that cannot be restored.

Examples:

Explain Environmental Assessment (EA) Process in Nepal (5)

Steps of Environmental Assessment Process

Screening

Screening is the first step of the Environmental Assessment process. It decides whether a project requires BES, IEE, or EIA based on its nature, size, and location.

Scoping

Scoping identifies the key environmental issues that need to be studied. It helps to set the boundary and focus of the assessment.

Baseline Environmental Study

This step studies the existing environmental condition of the project area, such as air, water, soil, forest, wildlife, and socio-economic condition.

Impact Identification and Prediction

In this step, possible positive and negative environmental impacts of the project are identified and their level is predicted.

Mitigation Measures

Appropriate measures are proposed to prevent, reduce, or control the negative environmental impacts.

Public Consultation

Local people and concerned stakeholders are informed about the project. Public hearing is mandatory for EIA projects in Nepal.

Preparation of EA Report

A detailed BES, IEE, or EIA report is prepared including impacts, mitigation measures, and Environmental Management Plan (EMP).

Review and Approval

The concerned authority reviews the report and provides environmental clearance if the report meets legal requirements.

Implementation of EMP

The Environmental Management Plan is implemented during construction and operation of the project.

Monitoring and Environmental Audit

Monitoring checks whether mitigation measures are properly applied, and environmental audit evaluates the overall environmental performance of the project.

Define EIA and Write Down the Importance of EIA in EA (5)

EIA stands for Environmental Impact Assessment. It is the detailed study and evaluation carried out to determine whether the implementation of a proposal will cause significant adverse effect on the environment, and to identify the measures that should be adopted to avoid, mitigate or minimize such effect.

The importance of EIA (Environmental Impact Assessment) in EA is given below:

Draw the Flow Chart of Environmental Impact Assessment (EIA) Process (5)

(See the EIA Process Flow Chart given above under "Explain Briefly About the Process of EIA (10)".)

Back to Topics